United States
Keyword
Load Dispatcher
Power System Dispatcher
Minimum ? B.E./B. Tech in Electrical Engineering
Not required
The tasks a Load Dispatcher is expected to perform include:
Co-ordinating activities of personnel engaged in operating generating stations, substations and lines of electric power system or electrified railway system
Ensuring adequate production and distribution of electricity to meet power demands
Monitoring control board showing operating condition of lines and equipment throughout system
Directing workers to make adjustments
Notifying maintenance crew of location and de-energization of troubled sector
Verifying that workers are clear of repaired equipment before directing energization of circuit
Compiling operational records
Knowledge of power dispatch operations
Familiar with relevant plant process and equipment
Understanding of plant capability
Skilled in calculating load estimates
Equipped to operate automatic program load-control functions
Not applicable
Safety-oriented
Manual dexterity
Self-motivated
Team player
It is a desk job
Need to handle a team of workers
Local travelling is not a part of this job role
Part-time work and contractual jobs are not available
Work from home option is not available
Working hours
Companies usually work for 5/6 days a week and 8/9 hours everyday. This may vary from company to company
Shift system maybe available
Is the job suitable for a candidate with special needs?No
The job is not listed as hazardous or dangerous as per The Factories Act, 1948 (section 87)
For freshers - INR 12,000 to INR20,000 per month
(These figures are indicative and subject to change)
Power Generation in India
Electrical load dispatching started in India ever since interconnected systems began to operate within the state power systems. Presently the power system in the country is demarcated into five regional grids and all the states and union territories in India fall into one of these regional grids. The electricity generation target for the year 2014-2015 was fixed as 1023 Billion Unit (BU) i.e. growth of around 5.77% over actual generation of 967.150 for the previous year (2013-2014). The generation during April-January, 2015 was 880.681 BU as compared to 805.838 BU generated during April- January 2014, representing a growth of about 9.29%.
With the growth in electricity generation, the importance of Load Dispatcher has also increased and the job prospects for this job role are improving.
State governments
Power generating companies
Indian railways
Cities and towns across India
Will be updated
Government colleges across India
Private institutes across India
Will be updated